Introduction

This is an on-line event, advance booking is not required.

The viewing link can be accessed by the button above.

Synopsis

The design and construction of the £1.5 billion A14 Cambridge to Huntingdon Improvement scheme presented a range of geotechnical challenges. The scheme had a large earthworks deficit where some 4 million cubic metres of the 7.2 million cubic metres of fill material required had to be won from borrow pits along the route. Mostly the founding conditions were chalky glacial till and heavily over-consolidated clays with piled foundations for all major structures. This provided the opportunity to optimize pile design to reduce the out-turn cost of the project.

The presentation will give an overview of the scheme and will describe the main aspects of the design and construction of the earthworks, retaining structures and structure foundations, including detail of the pile design methodology and pile test methods developed.

The project was short listed for the 2018 Ground Engineering Geotechnical Team of the Year and the organization of the multi located design team will be discussed.

Speakers

  • Paul Nowak

    Atkins

  • Dean Maddison

    Jacobs

More from BGA

  • Become a member

    Find out more about the benefits of becoming a member of the BGA.

    More Info
  • View our Corporate Members

    The British Geotechnical Association is grateful for the support of Corporate Members, and the organisations that the BGA Executive Committee members belong to.

    View our Corporate Members