18.04.2023 | 18:00-19:30

Resilient Geotechnics: Water Management Strategies for Construction

Speakers: Dr Stephen Thomas.

Past event: Please note this event information is displayed for informational purposes only.

Introduction

This event is planned as an in-person event, and registration is not required for in person attendees.

The event will also be webcast live. Advance registration is required for on-line attendees via the on-line viewing button above.

  • Date & Time
    Date & Time

    18.04.2023

    18:00 - 19:30

    Download to calendar

  • Location
    Location

    Godfrey Mitchell Theatre, Institution of Civil Engineers, One Great George Street, London SW1P 3AA

    View Map

  • Event Type
    Event Type

    BGA Meetings

  • Refreshments
    Refreshments

    Tea and coffee will be available from 17:30

Synopsis

To ensure that a civil engineering project is resilient to the many forces that impact on the project, meticulous planning is required to ensure that systems are in place to mitigate against such impacts.

This is particularly the case for projects that are exposed to the impact of water hazards, whether this be surface water flooding, or from the inundation of groundwater so causing slope failure, ground heave or soil liquefaction. Furthermore, because of ever more stringent legislation to safeguard the UK’s water resources, the requirements for Environment Agency & Scottish Environment Protection Agency Abstraction Licences & Discharge Permits can now cause significant delays to projects if such operations are not planned well ahead of time. To illustrate the meticulous planning required to provide both technical and legislative resilience for a complex civil engineering project, an exemplar case study is used to illustrate such geo-resilience.

To mitigate flooding in the city of Rochdale, the Environment Agency is constructing large attenuation lagoons in the region of Littleborough. The construction of these lagoons required construction of a storm culvert beneath the Network Rail Calder Valley Railway Line, and required a 4-day rail blockade during which the track was removed, ground excavated, culvert installed and the railway line reinstated. A robust and resilient groundwater control system was required to ensure that the hydraulic head in underlying alluvium (clay, sand, gravel) was maintained below excavation formation level in advance of, and during, the 4-day blockade. The design had to consider the highly permeable geology, the conditions of the Environment Agency abstraction licence and discharge permit, whilst ensuring that any settlement of the railway line & embankment was within acceptable limits to Network Rail.

Speakers

  • Dr Stephen Thomas

    OGI Groundwater Specialists

More from BGA

  • View our Corporate Members

    The British Geotechnical Association is grateful for the support of Corporate Members, and the organisations that the BGA Executive Committee members belong to.

    View our Corporate Members
  • The Rankine Lecture

    Widely viewed as the most prestigious of the invited lectures in geotechnics and was first held in 1961.